Projection model of a nuclear power plant
role: software part of the installation · Radugadesign

- year
- 2013
- type
- commercial
- tools
- Catalyst Media Server, projection mapping, Panasonic PT-DZ7000 ×10
- role
- software part of the installation
- studio
- Radugadesign
- description
- A projection model showing 42 months of construction day by day, season after season. The timeline cursor let visitors pick a period or a single building and read about it. Ten Panasonic 7000 projectors.
Projection model of a nuclear power plant — studio project at Radugadesign, 2013.
A projection model showing 42 months of construction day by day, season after season. The timeline cursor let visitors pick a period or a single building and read about it. Ten Panasonic 7000 projectors.
My role
Software part of the installation.
Tools & hardware
Catalyst Media Server · projection mapping · Panasonic PT-DZ7000 ×10